.png)
Santa Monica High School Discovery Building
Scope of Work:
Acoustical Sealants, Air/Moisture Barrier, BIM, Carpentry, Cold-Formed Metal Framing, Drywall Finishing, Fireproofing, Firestopping, Gypsum Board, hollow metal door frame installation, insulation, interior metal stud framing, lath, plaster, preconstruction, sheathing
Description:
The 260,000-square-foot Discovery Building consolidates flexible learning environments and student services within a five-story academic hub. It supports a broad range of programs through reconfigurable classrooms, science and technology labs, seminar rooms, and collaboration spaces organized around a central courtyard. Glazing, open circulation, and operable connections to outdoor terraces introduce daylight and visibility, while raised-access floors and non-load-bearing partitions allow interiors to adapt as instructional needs evolve. A large dining commons, indoor–outdoor gathering areas, and specialized instructional zones strengthen campus life and support both focused study and group work.
The building also incorporates community-oriented amenities, including a 50-meter Olympic-size pool, wellness spaces, and landscaped areas that extend learning outdoors. As a cornerstone of the district’s long-term campus modernization, the Discovery Building delivers a highly adaptable academic environment designed to support evolving pedagogies, student well-being, and future program growth.
.png)
.png)
.png)
.png)
.png)
.png)
%201%20(1).png)
.png)
.png)