.png)
SDUSD Memorial Preparatory Whole Site Modernization
Scope of Work:
Acoustical Ceilings, Acoustical Sealants, Air/Moisture Barrier, Architectural Metal Panels, BIM, Carpentry, Cold Formed Metal Framing, Drywall Finishing, FRP, firestopping, Gypsum Board, insulation, interior metal stud framing, lath, plaster, preconstruction, sheathing, scaffolding, linear metal ceilings
Description:
Located in San Diego’s historic Barrio Logan neighborhood, the Memorial Preparatory Whole Site Modernization transformed the existing campus into a state-of-the-art educational environment serving transitional kindergarten through grade 12. The 241,000-square-foot redevelopment includes a new child development center, preschool, wellness center, and performing arts theater—creating a unified campus designed to support learning, health, and community engagement. The project was designed to Collaborative for High Performance Schools (CHPS) standards, integrating sustainable materials and energy-efficient systems throughout.
SDI provided comprehensive framing and drywall services for both interior and exterior assemblies, along with plaster, architectural metal panels, acoustical and linear metal ceilings, and air/moisture barrier systems. SDI’s involvement from early design through completion ensured seamless coordination across multiple systems, effective resource management, and consistent quality throughout a dynamic campus that will serve San Diego students for generations to come.
.png)
.png)
.png)
.png)
.png)
.png)
.png)
%201%20(1).png)
.png)